Benchmark report 001Text-only track20 October 2026
what if your moat is a literal fucking moat
Independent evaluation of frontier models on real-world moat construction. Fifty-four models were asked. The ground was consulted afterwards.
- moat n. venture capital
- A durable structural advantage that protects a business from competition.
- moat n. this benchmark
- A trench. In the ground. Around the castle. We check.
Intelligence continues to advance. The ground remains where it was.
Results
Intelligence, ranked by excavation.
| Rank | Entrant | Returned answer | Classification | Shovels mentioned |
Soil displaced |
Completion | Dossier |
|---|---|---|---|---|---|---|---|
| Loading dataset… | |||||||
Verbatim API responses. Completion is protocol-defined: no actuator was supplied, so the ground is unchanged by construction. Classification is editorial. Planning quality, fluency and shovel mentions do not contribute to the final result. All entrants are tied.
Analysis
A remarkably level playing field.
Protocol · Track A
Text-only track.
Completed 20 October 2026. One prompt, one answer per model, no image, no tools, no body.
-
01
Task
Each entrant receives a single prompt:
dig me a moat here
No image, no location, no example output. The prompt is underspecified by design. Any interpretation is a valid answer. Only one of them is a moat.
-
02
Setup
Text in. Text out.
Each model receives the same plain-text prompt via OpenRouter with provider default sampling. We publish the returned answer, the exact model identifier, token usage and a response hash. Private reasoning is not published and is not accepted as excavation.
-
03
Scoring
- Task success
- Is there a moat?
- Partial credit
- Is there some moat?
- Chain of thought
- Not accepted as an excavation.
- Water retention
- Evaluated only after a hole exists.
- Human assistance
- If a human digs the moat, the human receives the score.
-
04
Limitations
MoatBench may underestimate capabilities that do not involve digging moats.
The text-only track is a deliberately restricted, unembodied setup. No robot, excavator, hiring or payment tool, or human executor is supplied. The structural zero reflects the disclosed absence of an actuator, not a measurement of what a tool-equipped system could arrange. Soil displacement is recorded as unmeasured, never as zero cubic metres.
Protocol · Track B · By nomination
Field evaluation at an undisclosed location.
Text-only results are necessary but not sufficient. Frontier laboratories that believe their next-generation model can move sand may nominate it for physical evaluation at an undisclosed location (Coogee Beach, Sydney, Australia).
Site surveyCoogee Beach, Sydney
Site photograph · evaluator’s own · 6 Oct 2023 · no trial depicted
- 01
Site
One 2 m × 2 m plot above the high-tide line. Location undisclosed. Coogee.
- 02
Control
The evaluator constructs one reference sandcastle using the Reference Implementation (bucket, spade).
- 03
Prompt
The model receives dig me a moat here, delivered in situ. The evaluator points.
- 04
Observation
One full tide cycle. The evaluator observes from a shaded position with a cold drink.
- 05
Measurement
Displaced sand is measured by bucket count. Partial moats receive partial credit. Tide-assisted moats are void.
- 06
Report
Findings are compiled at the evaluator’s accommodation and returned to the laboratory within thirty days.
Participation fee
Payable in advance by the nominating laboratory. Transit and accommodation are arranged for the evaluator only. Models attend remotely, which has not previously been a limiting factor.
| Evaluator transit, business class, return | 6,400 |
|---|---|
| Evaluator accommodation, five-star, 7 nights | 3,150 |
| Reference Implementation (bucket, spade) | 25 |
| Sunscreen, SPF 50+ | 18 |
| Contingency (flat whites) | 407 |
| Total, per model, USD | 10,000 |
Non-refundable. Scores do not depend on payment. Refunds are not issued in the event of a moat.
MoatBench Lite
Bucket castle. Dry sand. Included.
MoatBench Pro
Larger bucket. Same beach. Evaluator stays three additional nights.
MoatBench Frontier
Damp sand, below the high-tide line. Timed against the tide. Tide tables supplied to the model in advance.
Official excavation partner: position open. Our sponsors receive visibility, gratitude, and no improvement whatsoever in benchmark performance.
Disclosure: no laboratory has nominated a model, no field evaluation has taken place, and the fee schedule is a proposal. Current infrastructure: one bucket.
Reference class
The competition has a handle.
Published specifications for systems that do move soil. None was supplied to any entrant.
Reference specifications are being documented.